China source manufacturer · Factory-direct cold therapytreueenergy.com

FACTORY / ICE-BATH CHILLERS

On the chiller line.

From staged components through assembly, testing and packing.

See the process
Technician fitting components inside an open chiller on the assembly line

INCOMING & FLOOR

Components staged for assembly.

The roller line runs between workstations, with compressors in protective trays and coil assemblies on layered pallets. This stage prepares the compressors and coils for transfer to the assembly stations.

ASSEMBLY

Fitting the chiller interior.

Housings sit along the roller line; closer views show a technician working inside an open unit and a metal vessel beside insulated pipework. Here, the interior assembly brings the vessel and pipework together within the housing.

Factory overview Workshop footage of fabrication and chiller assembly.

TESTING & QC

Reviewing the open unit.

Two open chillers sit beside a laptop; the supporting views show a piped water loop with a digital meter and benches with overhead panels. These stations support review of the exposed components and a check of water circulation through the connected loop.

Outdoor icing observation Outdoor icing observation at a 0°C set point.

FINISHED STAGING

Enclosed units in staging.

Enclosed chillers stand in rows beside the line, while wrapped equipment rests on wooden pallets. This stage groups enclosed units and palletized equipment for the move to packing.

PACKING & OUTBOUND

Sealing cartons, securing cases.

Cartons sit beside a roller conveyor and yellow sealing frame; wooden cases carry straps and handling marks. This station completes carton closure and secures the wooden cases for outbound handling.

QUALITY / ON THE FLOOR

Checks along the line.

The photographs show the review stations and packing details below. Test limits, results and certificates are to be confirmed for the ordered configuration.

Chiller connected to a water-loop test bench with pipework and a digital meter
Water-loop bench Testing & QC
Visible checkpoints; certificate and report numbers to be confirmed.
CheckpointWhat is checked (visible)Evidence on pageCertificate / report #
Open-unit review Exposed wiring and pipework in open housings beside a laptop. Testing & QC / open-unit photo
Water-loop observation Visible pipe connections and a digital meter on the connected water-loop bench. Testing & QC / water-loop photo
Bench controls Overhead control panels above staffed test benches. Testing & QC / bench photo
Packing closure Carton-sealing station, case straps and handling marks. Packing & outbound / cartons and cases
Ask for the test checklist on inquiry

PRODUCT / PROCESS

Factory at a glance.

Product scope
Ice bath chillers / plunge systems
Process coverage
Incoming & floor Assembly Testing & QC Finished staging Packing & outbound
MOQ
Lead time
Certifications
Visit
By appointment

FACTORY VISIT / PROJECT INQUIRY

Bring your project to the floor.

Share your chiller requirements and the stations you would like to see to discuss a quote or arrange a factory visit.

Request a quote or visit